Glossary
DPP glossary
The terms you'll meet in Digital Product Passport legislation and projects.
- BIM
- Building Information Modelling, which the CPR passport must interoperate with.
- Central registry
- EU registry storing DPP identifiers (ESPR Art. 13), due 19 July 2026.
- Data carrier
- The physical means of accessing a passport, such as a QR code, NFC tag or RFID.
- Delegated act
- Commission legislation that sets product-specific requirements under ESPR.
- DPP
- Digital Product Passport — a structured digital record linked to a product via a data carrier.
- DPP service provider
- Third party hosting or processing passport data on behalf of an operator.
- Economic operator
- Manufacturer, importer, distributor or other party responsible for a product.
- EN 18216 series
- European DPP standards published in 2026.
- EPCIS
- GS1 standard for sharing lifecycle event data.
- EPD
- Environmental Product Declaration, common in construction.
- EPREL
- EU energy-label product database — not the same as a DPP.
- ESPR
- Ecodesign for Sustainable Products Regulation (EU) 2024/1781, the DPP framework law.
- Granularity
- Whether a passport applies per model, batch or individual item.
- GS1 Digital Link
- Standard for expressing GS1 identifiers as web URIs inside QR codes.
- GTIN
- Global Trade Item Number — GS1 identifier for a product class.
- JTC 24
- CEN/CENELEC committee writing horizontal DPP standards.
- Legitimate interest
- Battery-passport access level for repairers, remanufacturers and recyclers.
- LMT battery
- Light means of transport battery, e.g. e-bikes and e-scooters.
- Omnibus IV
- 2025 EU simplification package that delayed battery due diligence to 2027.
- Resolver
- Service that routes a scanned identifier to the right content.
- SLI battery
- Starter, lighting and ignition battery — no passport required.
- Unique product identifier
- A persistent code identifying a model, batch or item.
- Verifiable credential
- W3C standard for cryptographically provable claims.
- Working plan
- ESPR Working Plan 2025–2030, setting indicative priority product dates.