Sectors
When will the DPP reach your products?
Batteries, detergents and toys have fixed dates in law. ESPR product groups follow indicative adoption dates plus a transition of at least 18 months.
Battery Passport
In force18 February 2027
Light means of transport (LMT) batteries, industrial batteries above 2 kWh and electric-vehicle batteries — each individual battery, including those built into products.
CPR
In forceExpected ≈2028 — 18 months after the system delegated act
Construction products covered by harmonised technical specifications under the CPR.
Toy Safety
In force1 August 2030
Products designed or intended for play by children under 14, including online and imported sales.
Detergents
In force23 September 2029
Detergents and end-user surfactants placed on the EU market.
Textiles
In preparationExpected ≈2028–2029
Initially apparel. Not automatically every textile, carpet, technical textile or footwear category.
Iron & Steel
In preparationExpected ≈2028
Intermediate iron and steel products.
Aluminium
In preparationExpected ≈2029
Aluminium intermediate products.
Tyres
In preparationExpected ≈2029
Tyres placed on the EU market.
Furniture
In preparationExpected ≈2030
Furniture products.
Mattresses
In preparationExpected ≈2031
Mattresses.
Electronics
In preparationExpected 2028+ per product group
Energy-related products such as smartphones, tablets, appliances and ICT equipment.